Monte Carlo Simulation and Stochastic Cash-Flow Modeling for Reducing Liquidity Risk in Project-Based Enterprises

Authors

  • Mashfiqur Rahman Coordinator, Finance; BASIS-SEIP Tranche 3; Dhaka, Bangladesh Author
  • Md Ashrafuzzaman IT Administrative Officer; Abdul Kadir Mollah City College; Narsingdi, Bangladesh Author

DOI:

https://doi.org/10.63125/zf3fwv21

Keywords:

Monte Carlo Simulation, Liquidity Risk, Stochastic Cash Flow, Project Finance, Financial Resilience

Abstract

Liquidity risk represents a critical financial challenge for project-based enterprises because uncertainty in revenue realization, project costs, payment timing, schedules, and financing conditions can generate substantial mismatches between cash inflows and contractual obligations. This study quantitatively assessed the effectiveness of Monte Carlo simulation and stochastic cash-flow modeling for identifying, measuring, and reducing liquidity risk in project-based enterprises. A longitudinal retrospective dataset comprising 42 enterprises, 286 projects, and 8,964 project-month observations was analyzed, with data completeness of 97.4% and financial reconciliation accuracy of 98.8%. Historical analysis showed that actual project costs exceeded planned costs by 8.3%, project duration increased by 9.4%, 38.6% of project-month observations recorded negative net cash flow, and 41.3% of projects experienced cumulative cash deficits. Monte Carlo simulation generated 50,000 iterations per project, representing approximately 14.30 million stochastic cash-flow trajectories. The stochastic model estimated a 47.8% probability of negative cumulative cash balance, a 35.6% liquidity-breach probability, and a 15.9% debt-service failure probability. Mean expected shortfall reached $3.27 million, while the 5th-percentile minimum cash balance declined to −$3.64 million. Sensitivity analysis identified payment delays, cost overruns, revenue reductions, and schedule extensions as the dominant liquidity-risk drivers, collectively accounting for 74.0% of attributable liquidity variability. Mitigation analysis showed that a 10% cash reserve reduced liquidity-breach probability to 22.1%, while accelerating receivable collection by 20 days reduced it to 19.8%. Combined portfolio cash pooling and project-start sequencing reduced enterprise-level external financing requirements by 38.4% and financial-distress probability to 4.8%. Compared with deterministic forecasting, stochastic modeling reduced MAE from $128,400 to $91,600, RMSE from $181,700 to $132,900, and MAPE from 18.6% to 12.4%. Overall, the findings demonstrated that Monte Carlo-based stochastic cash-flow modeling provided a robust, statistically validated, and practically useful framework for quantifying downside liquidity exposure, identifying major risk drivers, optimizing liquidity protection, and strengthening financial resilience in project-based enterprises.

Downloads

Published

2022-06-30

How to Cite

Mashfiqur Rahman, & Md Ashrafuzzaman. (2022). Monte Carlo Simulation and Stochastic Cash-Flow Modeling for Reducing Liquidity Risk in Project-Based Enterprises. International Journal of Scientific Interdisciplinary Research, 1(01), 382–431. https://doi.org/10.63125/zf3fwv21

Cited By: